|
BERTHING WORKS |
Name |
Layout |
Length/with m
(feet) |
Structure |
Operating Company |
Use |
Service |
Ana mar |
Groyne |
5.6 x 2.6
(18.36 x 8.53) |
Fiber-glass pontoons |
Ana Mar Fleet, S.A. |
Tourism |
Defenses |
Flota Gordo |
Groyne |
5.0 x 2.3
(16.39 x 7.54) |
Wood |
Mr. Constancio Rodríguez |
Tourism |
Defenses |
Flota Perla |
Groyne |
10.0x 2.6
(32.79x8.52) |
Fiber-glass floats |
Flota Perla |
Tourism |
Defenses |
Flota Bibi |
Groyne |
5.0x 2.5
(16.39x1.20) |
Fiber-glass floats |
Guillermina Kelly de Coppel |
Tourism |
Defenses |
Escuela Técnica Pesquera
[Fishing Technical School] |
L |
31.3 x 6
(102.62 x 19.67) |
Reinforced Concrete |
Fishing Technical School |
NA |
Bitts, Defense |
Ferryboat Berth 3 |
Marginal |
35.0 x 4
(114.75 x 13.11) |
Reinforced concrete |
- |
NA |
Out of Service |
Ferryboat Berth 2 |
Marginal |
35.0 x 4
(114.75 x 13.11) |
Pile-cluster with ramp and aisle |
Sematur |
General load, |
Water, electricity, fuels, defense |
Ferryboat Berth 1 |
Marginal |
36.0 x 4]
(118.03 x 13.11) |
Reinforced concrete |
Sematur |
General load |
Water, fuels, defense |
Dock for passenger boats |
L |
70.0 x 10
(229.51 x 32.79) |
Reinforced concrete |
General Direction of Ports |
Tourism |
water, lighting, bitt, defense |
Pemex Dock |
T |
22.0x 16
(72.13 X 52.46) |
Reinforced concrete |
Pemex |
Fluids |
Fuels and fire-fighting services |
Fiscal Zone 5 Dock |
Marginal |
351 x 18
(1,150.82 x 59.02) |
Reinforced concrete |
General Direction of Ports |
General load |
Water, bitts and tracks |
Fiscal Zone 4 Dock |
Marginal |
168 x 18
(550.82 x 59.02) |
Reinforced concrete |
General Direction of Ports |
General load |
Water and tracks |
Fiscal Zone 3 Dock |
Marginal |
174 x 18
(570.49 x 59.02) |
Reinforced concrete |
General Direction of Ports |
General load |
Water, bitts, tracks |
Fiscal Zone 2 Dock |
Marginal |
185 x 18
(606.56 x 59.02) |
Reinforced concrete |
General Direction of Ports |
General load |
Water, bitts, racks |
PROTECTION WORKS |
| NAME
|
LOCATION |
PLAN LOCATION CONSTRUCTION YEAR |
LENGTH
meters
|
Crown Wide (m)
Crown High (m) |
STRUCTURE |
| La Azada Groyne |
Between Vigia and La Azada Hills |
0
1930-1932 |
270.0 |
10.00
5.0 |
Rock Up to 10 tons |
| Chivos Groyne |
Between former island La Piedra and Chivas |
110
1926-1930 |
1185.0 |
6.00
6.50 |
700 m. Rock fill and 485 concrete block |
| Crestón Groyne |
East of Crestón Hill |
111
1954-1955 |
450.0 |
6.00
8.0 |
Rock. Up to 20 tons |
| Chivos Breakwater |
West of former island Chivos |
112
1953-1954 |
300.0 |
6.00
8.0 |
Rock. Up to 20 tons |
| Ferryboat Station Breakwater |
Northeast of outer port |
113
1973 |
290.0 |
7.00
4.7 |
Rock. Up to 10 tons |
| Fishing shelter Breakwater |
At Urias Estuary |
114
1982 |
209.0 |
4.00
3.0 |
Rock. Up to 10 tons |
| Two masonry dams paraiso del mar |
In front of paraiso del mar condo |
0
1982 |
35.0 |
4.50
2.6 |
Rock. Up to 1 ton |
| Two masonry dams Las Flores hotel |
North of Punta Camaron |
0
1986 |
45.0 |
4.00
2.0 |
Rock. Up to 1 ton |
|
--------------------------------------------------------------------------------
Last Actualization:
Friday, August 27, 2010, 18:10, By Infraestructura.
|